装修工程进度计划表 Schedule of decoration project制表人:稻壳儿序号进度计划开工日期项目内容工期单位工程量单价合计金额备注预计完成工期2001☑×××年××月×日拆除墙体3天㎡15.325508426实际完成工期302☑×××年××月×日排水管改造5天m2.5250625完成率15.00%85.00%3☑×××年××月×日排污管改造6天m3.535012254☑×××年××月×日弱电改造7天m4.532014405□×××年××月×日强电改造8天m2.742011346□×××年××月×日铺设全屋电路改造4天m3.83091174.27☑×××年××月×日铺客厅地砖4天㎡9.932031688☑×××年××月×日铺厨房地砖5天㎡10.571074559□×××年××月×日铺卫生间地砖9天㎡3.2320102410□×××年××月×日铺房间木地板5天㎡5.6530296811□×××年××月×日铺阳台地砖2天㎡7.8420327612□×××年××月×日卫生间做防水6天㎡6.5620403013□×××年××月×日厨房做防水4天㎡3.512042014□×××年××月×日阳台做防水2天㎡7.5620465015□×××年××月×日屋顶防水4天㎡10.5720756016□×××年××月×日铺厨房地砖5天㎡3.2320102417□×××年××月×日铺卫生间地砖2天㎡5.6530296818□×××年××月×日铺房间木地板6天㎡7.8420327619□×××年××月×日铺阳台地砖6天㎡6.5620403020□×××年××月×日卫生间做防水7天㎡7.84203276合计100天63149.2